Production Deployment Guide¶
Status: 📝 Documentation in progress
Best practices for deploying Seeknal pipelines to production environments.
Overview¶
Deploying data pipelines to production requires careful planning, testing, and monitoring. This guide covers the end-to-end production deployment process for Seeknal pipelines.
Pre-Deployment Checklist¶
1. Pipeline Validation¶
Before deploying, validate your pipeline:
# Parse and validate configuration
seeknal parse
# Plan deployment to see what will change
seeknal plan prod
# Dry-run to preview execution
seeknal run --dry-run
2. Data Quality Checks¶
# Run data quality audits
seeknal audit
# Validate feature data (for feature groups)
seeknal validate-features user_features --mode fail
3. Environment Setup¶
# List available environments
seeknal env list
# Create production environment configuration
seeknal plan prod
Deployment Strategies¶
Virtual Environments (Recommended)¶
Use virtual environments to isolate development and production:
# 1. Create production environment plan
seeknal plan prod
# 2. Review the plan
seeknal env plan prod
# 3. Apply in isolated environment
seeknal env apply prod --dry-run
# 4. Execute production deployment
seeknal env apply prod
Benefits: - Safe testing before production deployment - Rollback capability - Change tracking and categorization
Direct Deployment¶
For simpler deployments, you can deploy directly:
Change Categorization¶
Seeknal automatically categorizes changes by impact:
| Category | Description | Example |
|---|---|---|
| Breaking | Requires manual intervention | Schema changes, dropped columns |
| Non-Breaking | Safe to deploy | New features, performance improvements |
| Additive | Expands functionality | New sources, transforms |
Review changes before deployment:
Production Best Practices¶
1. Use Source Control¶
# Version control your pipeline definitions
git add seeknal/
git commit -m "Deploy v2.0 to production"
git tag production-v2.0
2. Implement Monitoring¶
# Monitor pipeline runs
seeknal logs --pipeline orders_pipeline --tail 50
# Check recent executions
seeknal status
3. Set Up Alerts¶
Configure alerts for: - Pipeline failures - Data quality issues - Performance degradation - Data freshness checks
4. Schedule Regular Runs¶
5. Implement Rollback Procedures¶
# List feature group versions
seeknal version list user_features
# Rollback to previous version
seeknal materialize user_features --start-date 2024-01-01 --version 1
# Rollback environment changes
seeknal env rollback prod
Production Considerations¶
Performance¶
| Aspect | Recommendation |
|---|---|
| Incremental Processing | Use CDC to only process new data |
| Parallel Execution | Enable --parallel for independent nodes |
| Resource Limits | Set --max-workers based on available CPU |
Security¶
| Aspect | Recommendation |
|---|---|
| Credentials | Use environment variables, never commit secrets |
| Storage Paths | Use secure paths (not /tmp) |
| Access Control | Limit who can promote to production |
Reliability¶
| Aspect | Recommendation |
|---|---|
| Idempotency | Ensure operations can be safely retried |
| Validation | Run data quality checks before and after |
| Monitoring | Track pipeline health metrics |
Troubleshooting Production Issues¶
Pipeline Failures¶
# Check logs
seeknal logs --pipeline <name> --tail 100
# View recent status
seeknal status
# Validate configuration
seeknal validate
Data Quality Issues¶
# Run diagnostics
seeknal audit <node>
# Validate features
seeknal validate-features <feature_group> --verbose
Performance Issues¶
# Check execution plan
seeknal plan prod
# Enable parallel execution
seeknal env apply prod --parallel
Related Topics¶
- Virtual Environments — Isolate dev and prod
- Change Categorization — Understanding change impact
- Incident Management — Handling production issues
CLI Commands Reference¶
# Environment Management
seeknal env plan <env> # Preview changes
seeknal env apply <env> # Execute deployment
seeknal env promote <from> <to> # Promote environments
seeknal env list # List all environments
seeknal env delete <env> # Delete environment
# Change Management
seeknal plan # Show changes since last run
seeknal promote # Promote changes to production
# Monitoring
seeknal logs # View pipeline logs
seeknal status # Check system status
seeknal audit # Run data quality audits
Coming soon: Advanced deployment patterns, blue-green deployments, and canary release strategies.